New agricultural barn
Here we excavated and concreted a floor for this new agricultural barn. All spoil was moved on site with our own equipment. The bank had suffered from subsidence due to being too steep, so we excavated the bank to stabilise it.
PROJECT DETAILS
On this new barn we excavated a 450 M2 area and compacted crushed concrete for a base. We then power floated 100 M3 of reinforced concrete.
The bank around the barn was graded back to a 1 in 1.5 gradient or less to prevent any more subsidence.
To discuss your building requirements
call us today on +44 (0) 7969830178