Golden cap area 2 development
PROJECT DETAILS
6 new concrete bases, 6 brick drive ways and a new road; all with new edging curbs and road drainage. The whole area had all new sewage lines, water, gas, electric and fibre optic internet. Gabion baskets were used as a support for the new terraces for the lodges, in keeping with the surrounding area.
Pathways were slabbed and top soil used to finish the area.
To discuss your building requirements
call us today on +44 (0) 7969830178